NS 720 assembles a unit train as it pulls the first cut of Silversides out of the storage tracks located between Appalachia and Big Stone Gap, Virginia. Note that the mid-train radio control car a... (more)
The engineer waits for the conductor to align the switch so he can pull a cut of loads onto the main line. Once those loads clear the switch, he'll couple to the other cut of loads to complete his... (more)
Although the weather was gray and dreary, the conductor on NS 607 was quite happy and cheery and in the Christmas spirit dressed as Santa on the run. NS 607 was almost to Roaring Branch between Ap... (more)